Amity MBA Assignment A
Q1. what do you understand by Total Quality Management, what are the requirements to implement TQM approach in an organization.
Q2. Explain, Philip B Crosby’s contribution in the field of Quality Management. How his ideas similar and different from ideas of Deming?
Q3. With the help of a practical example, explain how you will use control charts, also explain the guidelines you will follow to analyze and interpret the results.
Q4. What is Benchmarking, what are the steps you will follow to implement Benchmarking in an organization.
Q5. Explain the role and importance of employees in implementing TQM in an organization, what measure organization should take to deliver a certain level of satisfaction to them?
Q6. With one example each, explain the seven basic tools of quality management?
Q7. You are working as a general manager of an organization, explain the various steps you have to take for getting your organization certified for ISO 9000:2000 or ISO 9000:2008 ?
Q8. what do you understand by the term work system, “do you think improvement of work system will eventually lead to implementation of TQM” justify your answer.
Amity MBA Assignment B
(Case Study)
A manufacturing plant make wind mill assemblies & can produce 50 units in a month in two period of 15 days each ; following is the data for number of defects arising per month.
1. which control chart should be used for the above data and why?
2. Make the appropriate control chart on a graph paper.
3. Interpret the chart and give your recommendation. Whether the process is in control or not?
Amity MBA Assignment C
1 while evaluating the quality of a product, aesthetics means—
2. Quality Circle is a
3 The concept of quality trilogy which mention quality management as quality planning, quality control and quality improvement is given by—
4 The concept “Quality is Free” is given by—
5 The concept of quality loss function is given by
6 Theory of profound knowledge is stated by
7 Quality management deals with
8 flow chart or diagram is
9 QFD is a technique of
10Supplier Partnering is a process
11 the methods to handle change in an organization during implementation of TQM are
12 motion study involves
13 Work measurement is
14 Ergonomics deals with
15 work system is
16 Lot Acceptance sampling plan is a method
17 for variable data the control chart which is made is
18 For defectives, when sample size “n” is constant the ________________control chart is prepared.
19 For defects, when sample size “n” is variable the ___________________ control chart is prepared.
20KANBAN is
21 Poka yoke can be defined as
22 kaizen is
23 ( N,n,c ) sampling plan is used for LASP, here
24 Check sheet is a quality tool in which
25 Fish bone diagram is
26 KJ diagram is
27 Tree Diagram
28 Arrow diagram is
29 PDPC means
30 Voice of customer means
31 The concurrent engineering give the ability to the organization to
32 Fault Tree analysis
33 Benchmarking is a process
34 Value engineering is a process
35 for Total quality management which of the following is not true
36 Reengineering is a process of
37 NC in iso means
38 surveillance audit
39 MBNQA award means
40 Internal Benchmarking
or
Q 1 Tree Diagram
Options
is an analytical tool used in quality management for planning, devising solutions and for better decision making.
breaks down the process in sub processes for better understanding
is an example of basic tools of quality required to collect the frequency of an event in the branches of tree
None of the above
2 Reengineering is a process of
Options
Redesigning business processes, associated systems and organizational structures to achieve a dramatic improvement in business performance.
To change the current product portfolio and diversifying in other product.
To completely transform the organizational structure and climate for developing better products.
Redesigning production department so that they can produce better products for the market
23 ( N,n,c ) sampling plan is used for LASP, here
Options
N is sample size, n lot size, and c is acceptance number
N is acceptance number, n is sample size and c is lot size.
N is lot size, n is sample size and c is acceptance number
N is sample size, n is acceptance number and c is lot size
4 Check sheet is a quality tool in which
Options
The frequency & type of an occurrence is recorded
A bar graph depicting frequency of an event
Similar to checklist to see everything is normal
A sheet which is filled by manager while doing maintenance work of a machine.
5 Quality Circle is a
Options
A team of volunteer group composed of employees or workers or trainees (or even students) who meet to talk about workplace improvement and quality management in the organization.
A team of employees which is formed to address quality issues of the company
A team of personnel selected from quality department to analyze opportunities of quality improvements
A research team from quality consultancy company for improving the system of the organization
6 The concept of quality trilogy which mention quality management as quality planning, quality control and quality improvement is given by
Options
Deming
Juran
Taguchi
Crosby
7 The concept “Quality is Free” is given by
Options
Deming
Crosby
Shiego Shingo
Ishikawa
8 flow chart or diagram is
Options
A chart to know the cause and effect of a process.
To diagrammatically representing process for better understanding
Plotting the data collected from a process for analysis
None of the above
9 QFD is a technique of
Options
To control the quality of product by using statistical analysis
To control the quality of product by using statistical analysis
To gather the voice of customer and converting it into actual product to satisfy them.
The application for MBNQA award.
10 Supplier Partnering is a process
Options
Of making supplier as a partner by sale of company shares to them
To train and develop them so that in puts received from them is of right quality.
To share gains and profits with the supplier
None of the above
11 the methods to handle change in an organization during implementation of TQM are
Options
Communicate, Empathize and support
Delegate, instruct and command
Negotiate, recruit and negotiate
Collective bargaining.
12 motion study involves
Options
Systematic processes to analyze the movements of material in a process
Systematic processes to analyze the different movements completed to perform a job.
Systematic process to analyze the motion of machine parts in a plant
Movement of information in an organization
13 Work measurement is
Options
A technique of recording the various steps that has to performed to complete the task
A technique to record the output of a process to improve productivity.
A technique of recording the content and timing of the various steps that has to performed to complete a task
All the above
14 Ergonomics deals with
Options
The work and the human effort done to perform the work, a technique to reduce the physical stress of an employee.
The flow of work from one process to another, a technique to reduce the time for overall process.
The flow of material within the system of production
It analyze the people’s interaction in an organization
15 kaizen is
Options
system to use visual signals to control the movement of materials between the different processes and work centers
a device or a system that either prevents a mistake from being made or makes the mistake obvious at a glance.
It is the process of continuous improvement in small increments that make the process more efficient, effective, under control, and adaptable.
None of the above
16 KJ diagram is
Options
Is tool to collect data and represent in KJ chart and find out improvement in a process
House of quality is the other name of it and is used to design better quality product
is tool to organize a large number ideas or views to discover meaningful groups based on some relevant relationship.
A quality improvement tool developed by Imai required in Kanban system
17 Arrow diagram is
Options
An example of chart made in CPM and PERT analysis.
A diagram in which the cause and effect of different processes are defined using arrows
A diagram which represent a work system and their relations with each other with the help of arrows
A method of employee well being used for rating the employee satisfaction in the organization.
18 The concurrent engineering give the ability to the organization to
Options
Design the product in economical way
A strategy of product development for faster market response and better quality of product
to find out the better alternatives for producing the product.
all the above
19 Fault Tree analysis
Options
is a graphical technique used to determine in advance the list of undesirable events that design team must take care of to avoid any failure which can result into an undesirable outcome.
Is a decision making technique for finding faults in the process.
Is a graphical technique used to determine the cause and effect relationships in events resulting in to failure of work system
A decision tree’s another name
20 Benchmarking is a process
Options
To learn and adopt a process or system of doing a work from the best in the industry or organization
To copy a process of doing things from the best
To set standards for each process which has to be achieved by the process owner
Standards required to get MBNQA
21 for Total quality management which of the following is not true
Options
integrates all the levels of the organization
it is a system dependent approach and hence doesn’t require much participation of people
it is a system dependent approach and hence doesn’t require much participation of people
all stakeholders of the company are the customers
22 surveillance audit
Options
Done by internal auditors of the company
Conducted by customers to ensure the standards are being followed
Conducted by certifying body to see whether the standards are being followed
Conducted at the time of giving the certificate to the organization
23 work system is
Options
Set of steps that have to be undertaken by a person to perform a task.
Integration of infrastructure, information, person and technologies to perform a work in an organization.
A system of how to use the inputs for processing
None of the above
24 Lot Acceptance sampling plan is a method
Options
A technique by which the samples are drawn from the lot
A technique by which using sampling acceptance or rejection of lot is being decided
A technique to remove defects from a lot using sampling
A technique by way of which the process is improved using sampling.
Contact www.solvedhub.com for best and lowest cost solution or email s
25 for variable data the control chart which is made is
Options
n chart
np chart
np chart
X bar, R chart
26 For defectives, when sample size “n” is constant the ________________control chart is prepared.
Options
p
p or np
c or u
X bar, R
27 For defects, when sample size “n” is variable the ___________________ control chart is prepared.
Options
X bar S
u
p
X bar, R
28 KANBAN is
Options
Kanban is the system to use visual signals to control the movement of materials between the different processes and work centers
Kanban is the continuous improvement by small incremental improvements in the processes of the organization.
Kanban is the process of recording defects of a process on a card
Kanban is a quality tool required for implementing Deming quality management principle.
29 Poka yoke can be defined as
Options
system to use visual signals to control the movement of materials between the different processes and work centers
a device or a system that either prevents a mistake from being made or makes the mistake obvious at a glance.
It is the process of continuous improvement in small increments that make the process more efficient, effective, under control, and adaptable.
None of the above
30 while evaluating the quality of a product, aesthetics means
Options
The performance of the product for which it is being purchased
The efficiency of the product
The efficiency of the product
The style and designing of the product.
31 The concept of quality loss function is given by
Options
Crosby
Taguchi
Deming
Ishikawa
32 Theory of profound knowledge is stated by
Options
Deming
Taguchi
Crosby
Ima
33 Quality management deals with
Options
Establishing standards and following them
Enhanced customer satisfaction by developing products based on customer expectation
Reducing the number of defects in the product or service and continuous improvement
All of the above
34 NC in iso means
Options
No conduct
Non conformance
No cost
Not confidential
35 Fish bone diagram is
Options
A diagram showing the processes of a system, used for better understanding of a process
A quality improvement tool where through graphical representation of cause and effect relationships of different events are analyzed
A quality tool made with fish bones used as recording the evens on a chart
There is no such diagram in Quality management
36 PDPC means
Options
Product design process control
Product design process control
Product development and process control
Process design program chart
37 Voice of customer means
Options
The analysis of the customer complaints
The explicit and implicit customer needs
The expectations of customer and feedback
All the above
38 Value engineering is a process
Options
a method of improving the value of product or service by finding alternative ways and inputs available at lower cost
to enhance the value of product by adding new features
to use high quality inputs and reducing the labor cost of operation to increase the value of the product
a product development strategy in which customer develop the product for the company
40 Internal Benchmarking
Options
To adopt the best practices of an organization from same industry
To adopt the best practices of an organization from same country
To adopt the best practices from the same organization
To adopt the best practices from international business
41 MBNQA award means
B Malcom Baldrige National Quality Award
or
- Who developed 14 points to guide companies in quality development?
- who is responsible for quality?
- Who is also known as Father of Quality Control?
- With total quality perspective, employees is empowered to think and make recommendations for which of the following?
- zero defect planning requires total commitment of ……….level management.
- …….seeks to improve the quality of process outputs by identifying and removing the causes of defects
- …………. and technological progress are key determinants of economic growth.
- …….is not a process tools for TQM systems
- …………..is used for projects aimed at creating new product or process design
- which is not the option applicable to the technology reference framework for advanced countries?
- which is technologically backward country?
- Which set of international standard focusess on company’s enviornment responsibility?
- While the terminology and expressions are
- Whis is not a process tools for TQM systems?
- ………………. drives business innovation and incubation in domains outside current core
- ………………….. is the process of causing a system variable to conform to some desired value.
- A ………….. is a technology that has been in use for long enough that most of its initial faults and inherent problems have been removed or reduced by further development.
- A …………..is an interconnection of components forming a system configuration that will provide a desired system response.
- A business strategy in which tasks are done in parallel considering every aspect of a product’s development process is known as ……….engineering.
- which is not correct for the statement ‘alternative technology is at the heart of development process’
- which is not correct for the value of human dignity?
- which is not part of technique?
- which is not related to management of technology?
- which is not the elements of TQM system?
- Any process that comes ito physical contact with the product that will be delivered to an external customer is ….
- appropriateness of a technology can be measured in terms of …..
- Assured quality is necessary for building customer confidence
- at the time of making an purchase agreement with a vendor, what is important to mention about inspection?
- which is incorrect?
- which is incorrect?
- which is not a factor for a good technology?
- which is not a problem in acquiring technology?
- which is not a production factors in consideration of a technology?
- Deming’s approach requires an organization-wide cultural ……………….
- Deming’s focus was on
- developing an energy efficient car is….
- development of man does not mean ………
- development of technological capabilities does not include …..
- evaluation of cost of quality is a programme to identify the price of non-conformance and the price of conformance
- Following are used in six sigma
Contact www.kimsharma.co.in for best and lowest cost solution or
Email: solvedstudymaterial@gmail.com
Call: +91 82907-72200 (Call/WhatsApp) or +91 88003-52777 (WhatsApp Only)
Need assignment on above given ID.
once got confirm we’ll request for more assignment with payment.
Initially provide one assignment with answer.
Thanks!!!
Yes all subjects are available, 150/- per subject.
Please send me your contact number or call me or whats app me on 09971223030